In short
Ask for evidence rather than labels: the grid carbon intensity and hourly clean-power share where your work runs, the site's PUE and water use, how long hardware stays in service, and whether you will get energy and emissions data for your own account. In the EU, larger data centres must report energy and water use, so the data often exists. Choose clean hosting, but keep cutting the work you send there.
Steps
- Ask which sites and regions will host your workload and their grid carbon intensity.
- Ask for the share of electricity matched hour by hour with clean power, not just annual certificates.
- Ask for each site's PUE and water use, and how they are measured.
- Ask how long servers stay in service and what happens to them afterwards.
- Require monthly energy and emissions data for your account in the contract.
Choose hosts on evidence about place, power, water and hardware, not on the word "green". Where and how your AI runs sets the carbon and water behind every request.
What should I compare?
| Question | Why it matters |
|---|---|
| Which region and grid? | Grid carbon intensity varies widely; some providers publish it per region |
| Hourly clean-power share? | Annual certificates don't change what the grid supplies at a given hour |
| PUE? | Shows energy lost to cooling and power conversion; see PUE and WUE |
| Water use and source? | Matters most in water-stressed areas |
| Hardware lifetime? | Longer service spreads manufacturing emissions over more work |
| Account-level reporting? | You need your own figures for your own reporting |
Google Cloud, for example, publishes the carbon-free energy share and grid carbon intensity for each of its regions. The Uptime Institute's 2025 survey found that average PUE levels showed little change for the sixth year running, so a site well below the industry norm is worth asking about.
What does regulation give me?
In the EU, Delegated Regulation 2024/1364 requires operators of data centres with at least 500 kW of IT power demand to report energy performance, including energy and water use, to a European database. Ask suppliers for those figures even if you are outside the EU.
Common mistakes
- Treating a green host as job done. It doesn't fix wasteful software; keep the efficiency work going.
- Accepting a single company-wide figure when your workload runs in specific regions.
- Forgetting latency and data rules, which may limit where you can run.
See hosting and data centres and sustainable AI procurement.
Sources
- Commission Delegated Regulation (EU) 2024/1364 on the first phase of the establishment of a common Union rating scheme for data centres, European Commission (2024)
- Uptime Institute global data center survey 2025, Uptime Institute (2025)
- Carbon free energy for Google Cloud regions, Google Cloud (2025)
Related
How do I make sense of PUE and WUE figures?
PUE shows a data centre's energy overhead; WUE shows its on-site water per kWh. What the numbers mean, how to compare them and what they leave out.
How do I check whether my AI runs on renewable energy?
Tell hourly clean power from annual certificates: ask where your AI runs, the grid's carbon intensity and the hour-by-hour clean share for that region.
How do I put sustainability into AI procurement?
What to ask AI suppliers about energy, carbon, water and location, how to score the answers in a tender, and what to write into the contract.
Green AI hosting and data centres
How to choose where AI runs: grid carbon intensity, PUE and WUE, renewable energy claims, water use and siting, with questions to ask hosts.