How do I have a say on a data centre planned near me?

Updated · 1 min read

In short

Find the planning application, read the developer's statements on energy, water, noise and heat, and comment within the consultation period with specific, evidence-based questions. Ask how much grid capacity and water the site will use, whether waste heat will be reused, and what energy and water figures will be reported once it runs. Specific questions carry more weight than general objections.

Steps

  1. Find the planning application on your local authority's or planning body's website and note the deadline for comments.
  2. Read the energy, water, noise and environmental statements before you write anything.
  3. Ask specific questions about grid connection, water source, cooling method and waste-heat reuse.
  4. Ask the operator to commit to publishing annual energy, PUE and water figures once the site runs.
  5. Submit your comments in writing before the deadline and share them with local councillors or representatives.

You have most influence during the planning consultation, and specific questions count for more than general objections. Data centres are long-lived, large users of electricity and sometimes water, so local decisions shape their footprint for decades.

The International Energy Agency estimates that data centres used about 415 TWh of electricity in 2024, around 1.5% of the world's electricity, and projects it to more than double to about 945 TWh by 2030, with AI the most important driver. Much of that growth lands on particular towns and grid connections.

What should I ask?

  • Electricity: how much grid capacity will the site take, and will it add new clean generation or compete with homes and businesses for existing supply?
  • Water: what cooling method will it use, where will the water come from, and how much in a hot, dry summer?
  • Heat: can waste heat feed a local heat network, homes or greenhouses?
  • Reporting: will the operator publish annual energy, power usage effectiveness (PUE) and water figures? In the EU, data centres with at least 500 kW of IT power already report these to a common scheme under Delegated Regulation (EU) 2024/1364; elsewhere you can ask for the same voluntarily.
  • Local benefit: jobs, noise, traffic and land use, as for any large development.

Common mistakes

  • Objecting in general terms. Planning bodies weigh material considerations; precise points about water, noise or grid capacity are easier to act on.
  • Missing the deadline. Consultation windows can be short.
  • Assuming "renewable" settles it. Ask whether clean power is matched hour by hour or covered by annual certificates; see whether AI runs on renewable energy.

Planning rules differ by country, so check how your local system works. For what good answers look like, read hosting and data centres and our guide for everyone.

Sources

  1. Energy and AI, International Energy Agency (2025)
  2. Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres, EUR-Lex (2024)